Trail work – Dogwood Dell. Meet at the Pump House at 9am on Saturday, February 8th.
We will be hand-building a re-route, approximately 150’, that gets us around the muddiest area on the trail.
If we have enough people come out to help, we’ll send small groups around the loop to clean out/drain the many mud-holes that have formed in the bottoms of the dips. If we have even more time/man-power we’ll send a group down North Trail to do the same, perhaps all the way to the Maymont Ramp. That would set us up nicely to continue next week with groups starting at North Bank and Tredegar working towards each other.
The trails need our help, please try to spare an hour or two (or more) to get them back into shape so they’ll still be fun to ride once they dry out again.